Volta-PLN
Private sourceWarehouse material management: stock, vendors, incoming and outgoing materials, and operational transaction documents.

Organised materials. Connected operations. Material management, stock movements, and operational documents: DPB, K3, and K7. Application sign-in preview · one screenshot available
My contribution highlights
- Worked on domains/HTTPS and restricted access to internal files and documentation on the web server.
- Changed login to use usernames and prepared supporting data migrations.
- Worked on QR validation, public scan results, return forms, and material search in the team’s returns development.
Contents · 8 contribution modules
Main workflow
6 stepsWarehouse staff connect master material data to transactions, stock changes, and operational documents. Returns have a separate development path.
01Select materials and transactions
Manage master data
Warehouse staffChoose transaction direction
Warehouse staff
02Record warehouse movements
Save transactions and stock
App & PostgreSQLQR-based returns
Staff · returns path
03Prepare documents and reports
Open operational documents
Warehouse staffExport and maintain
Staff & system operator
Process details & branches
Manage master dataWarehouse staff
Material and vendor records provide the reference for item selection in operational warehouse forms.
Choose transaction directionWarehouse staff
Choose materials and quantities for the movement being recorded.
Incoming or outgoing materials?
- Incoming. Record material receipts and their related transaction information.
- Outgoing. Record material issues for operational needs.
Save transactions and stockApp & PostgreSQL
Incoming/outgoing records are connected to stock data so material movements can be traced through transactions.
QR-based returnsStaff · returns path
For returns, QR scan results and material search help populate the return form. This path is part of returns development.
Open operational documentsWarehouse staff
Recorded data is used to manage and print DPB, K3, and K7 documents in the relevant modules.
Export and maintainStaff & system operator
Operational data can be exported to spreadsheets. Operators have backup/restore procedures for database maintenance.
QR returns are an optional path on the returns development branch. Incoming/outgoing transactions remain the basis of stock records and warehouse documents.
About Volta-PLN
Volta-PLN is a warehouse operations application for managing materials, vendors, incoming/outgoing stock, DPB/K3/K7 documents, and spreadsheet exports. Transaction data supports tracing material movements and preparing the documents needed for warehouse work.
Within the team, I focused on PHP application deployment, PostgreSQL management, authentication, Linux environment troubleshooting, and QR-based material returns.
My contributions
PHP application deployment on Linux
I prepared the deployment structure with Nginx and PHP-FPM, application file placement, and supporting configuration. I also worked on Docker/Compose artefacts for running the application. This work connects PHP code, environment configuration, and database services with application access requirements.
Domains, HTTPS, and internal file restrictions
I worked on domain and HTTPS configuration and improved web server restrictions on internal files. Operator documentation and configuration are placed under appropriate access rules so they are not exposed through the application’s public paths.
PostgreSQL backups and scheduling
I built database backup scripts, archive checks, and checksums to inspect backup outputs. Locks prevent overlapping jobs. I also prepared service/timer configuration so backups can run on a schedule in the configured server environment.
Database restore, validation, and rollback
I developed restore procedures with input archive checks and recovery-stage validation. I added a rollback path to retain the previous database when a restore or its validation fails. The procedure connects recovery steps to the conditions operators need to check.
Username-based login and data migration
I changed authentication to username-based login and prepared supporting migrations. I aligned forms, login checks, and account data so the new sign-in method works with the application’s existing user structure.
DPB endpoint and document fixes
I fixed DPB endpoints and document printing paths. This included consistent filename and path casing, since Linux filesystems treat case differently. These fixes addressed connections between the interface and application endpoints.
Material returns and QR scanning
On the returns development branch, I worked on QR workflow validation, public scan result pages, and material return forms. I added search to material selectors so staff can find the correct item when recording a return. This path connects the scanned material identity with the return process.
Redeployment and operations documentation
I documented application redeployment, backup, and restore steps. The documentation connects server configuration, application files, and the database into a clear maintenance sequence that can be handed over to the next operator.
Fields & core technologies
Project fields
Core technologies
18 commits in the last 12 months
All branches| Nov | Dec | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sept | Oct | Nov | |||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Sunday | |||||||||||||||||||||||||||||||||||||||||||||||||||||
| Monday | |||||||||||||||||||||||||||||||||||||||||||||||||||||
| Tuesday | |||||||||||||||||||||||||||||||||||||||||||||||||||||
| Wednesday | |||||||||||||||||||||||||||||||||||||||||||||||||||||
| Thursday | |||||||||||||||||||||||||||||||||||||||||||||||||||||
| Friday | |||||||||||||||||||||||||||||||||||||||||||||||||||||
| Saturday |
How it is counted · 1 repo · 2 branch
My authored commits reachable from all remote branches at sync time. Each SHA is counted once, even across branches or forks. Merge commits are excluded. Dates use the author timestamp in Western Indonesia Time (UTC+7), rather than push time. The current streak remains active when the last commit was yesterday and today is still in progress.
This calendar covers commits across all branches. Its totals may differ from GitHub’s contribution calendar, which includes other activity types and follows its own branch rules. This calendar covers only the project you are viewing.
Contribution history
18 of my non-merge commits · All branches · Data as of 3 November 2026.